Roadworks Works during November – near 17WR and at ZigZag Road

UK Power Networks now have a start date to carry out  works involving upgrading an underground electricity connector. They will be using a sub contractor who is being properly briefed by UKPN on traffic management.

o/s 17 Welcomes Road Kenley

UKPN ref- 240104449 – LB 1L4517)
Start date –           18/11/2020
Permit end date –   26/11/2020
Permit Number —   PW00000021428

Works will involve excavation (approx. size 8m x 1.1m x 0.9m) cable jointing and reinstatement. Whilst on site the road width past the works will be restricted to 2.5m, wide. When leaving site overnight, access past the works should be 3m wide.

Contact Information:
Sean Reeves
Powercare Agent
UK Power Networks
07812 263013

Whilst the UKPN works are on-going please avoid using the lower part of Welcomes Road if you can.

At Zig Zag Road

Junction of Zig Zag Road and Welcomes Road: Starting Wednesday 18th November until first thing Monday morning 23rd Nov. To make good damage by construction site traffic using Zig Zag Road contrary to Council routing instructions by installing some new kerbing, breaking out surface of bellmouth and first section of Zig Zag Road and laying 20mm sub base and 10mm SMA running course. The road will be closed most of the time so please use Abbots Lane for this period. It will be passable for pedestrians. Although the work will be finished by Friday night Zig Zag Road will remain closed over the weekend to allow the SMA surface course to cure

The contractor will open the road early on Monday morning so the refuse lorry can get past. Your patience is appreciated and please be nice to the people doing the work!

Copyright 2019-2023 Welcomes and Uplands Road Association.      Privacy policy